---
title: "Which companies use Earned Value Management?"
description: "Companies using Earned Value Management include Northrop Grumman, Raytheon, Lockheed Martin, BAE Systems, Inc. and more."
canonical: https://jobspipe.dev/technologies/earned-value-management
---

# Which companies use Earned Value Management?

> Companies using Earned Value Management include Northrop Grumman, Raytheon, Lockheed Martin, BAE Systems, Inc. and more. 2,116 companies whose own job postings show they use Earned Value Management: 270 confirmed, 1,846 likely. Updated daily from live postings.

**Canonical URL:** https://jobspipe.dev/technologies/earned-value-management

2,116 companies use Earned Value Management according to their own job postings: 270 confirmed and 1,846 likely, across 13,181 job postings that name it. The 100 listed below are confirmed users with at least 2 postings and a verified website. The rest are counted here but not named.

- **Confirmed companies:** 270
- **Likely companies:** 1,846
- **Postings naming Earned Value Management:** 13,181
- **Category:** Methodology
- **As of:** 19 Nov 2026

## Companies using Earned Value Management

| # | Company | Postings naming it | Last seen |
|---|---|---|---|
| 1 | [Northrop Grumman](https://jobspipe.dev/hiring/northropgrumman.com) | 770 | 19 Nov 2026 |
| 2 | [Raytheon](https://jobspipe.dev/hiring/rtx.com) | 740 | 19 Nov 2026 |
| 3 | [Lockheed Martin](https://jobspipe.dev/hiring/lockheedmartin.com) | 572 | 18 Nov 2026 |
| 4 | [BAE Systems, Inc.](https://jobspipe.dev/hiring/baesystems.com) | 265 | 18 Nov 2026 |
| 5 | [Turner & Townsend](https://jobspipe.dev/hiring/turnerandtownsend.com) | 112 | 18 Nov 2026 |
| 6 | [Blue Origin](https://jobspipe.dev/hiring/blueorigin.com) | 80 | 18 Nov 2026 |
| 7 | [Honeywell Aerospace](https://jobspipe.dev/hiring/honeywellaerospace.com) | 70 | 18 Nov 2026 |
| 8 | [AtkinsRéalis](https://jobspipe.dev/hiring/atkinsrealis.com) | 59 | 19 Nov 2026 |
| 9 | [Leonardo DRS](https://jobspipe.dev/hiring/leonardodrs.com) | 50 | 18 Nov 2026 |
| 10 | [Sierra Nevada Corporation](https://jobspipe.dev/hiring/sncorp.com) | 47 | 17 Nov 2026 |
| 11 | [QinetiQ US](https://jobspipe.dev/hiring/us.qinetiq.com) | 37 | 18 Nov 2026 |
| 12 | [Draper](https://jobspipe.dev/hiring/draper.com) | 33 | 14 Nov 2026 |
| 13 | [General Atomics Aeronautical Systems](https://jobspipe.dev/hiring/ga-asi.com) | 31 | 18 Nov 2026 |
| 14 | [Long Wave Inc.](https://jobspipe.dev/hiring/longwaveinc.com) | 29 | 14 Nov 2026 |
| 15 | [Arcadis](https://jobspipe.dev/hiring/arcadis.com) | 26 | 18 Nov 2026 |
| 16 | [Bechtel](https://jobspipe.dev/hiring/bechtel.com) | 23 | 14 Nov 2026 |
| 17 | [Austal](https://jobspipe.dev/hiring/austal.com) | 22 | 16 Nov 2026 |
| 18 | [Moog, Inc](https://jobspipe.dev/hiring/moog.com) | 22 | 15 Nov 2026 |
| 19 | [Westinghouse Electric Company](https://jobspipe.dev/hiring/westinghousenuclear.com) | 22 | 18 Nov 2026 |
| 20 | [General Dynamics Electric Boat](https://jobspipe.dev/hiring/gdeb.com) | 21 | 18 Nov 2026 |
| 21 | [Wood](https://jobspipe.dev/hiring/woodgroup.com) | 18 | 16 Nov 2026 |
| 22 | [Textron](https://jobspipe.dev/hiring/textron.com) | 15 | 2 Nov 2026 |
| 23 | [Costain](https://jobspipe.dev/hiring/costain.com) | 14 | 17 Nov 2026 |
| 24 | [Ultra Maritime](https://jobspipe.dev/hiring/umaritime.com) | 14 | 14 Nov 2026 |
| 25 | [Textron Systems](https://jobspipe.dev/hiring/textronsystems.com) | 13 | 2 Nov 2026 |
| 26 | [Cooper Moss Rutland](https://jobspipe.dev/hiring/cmr.global) | 12 | 5 Nov 2026 |
| 27 | [General Dynamics Ordnance and Tactical Systems](https://jobspipe.dev/hiring/gdots.com) | 12 | 17 Nov 2026 |
| 28 | [Gleeds](https://jobspipe.dev/hiring/gleeds.com) | 12 | 17 Nov 2026 |
| 29 | [Intra Management Solutions, Inc.](https://jobspipe.dev/hiring/intramanagement.us) | 12 | 18 Nov 2026 |
| 30 | [Saab Australia](https://jobspipe.dev/hiring/saab.com.au) | 11 | 18 Nov 2026 |
| 31 | [Karman Space & Defense](https://jobspipe.dev/hiring/karman-sd.com) | 10 | 12 Nov 2026 |
| 32 | [NuScale Power](https://jobspipe.dev/hiring/nuscalepower.com) | 10 | 9 Nov 2026 |
| 33 | [DCS Corp](https://jobspipe.dev/hiring/dcsfintech.com) | 9 | 18 Nov 2026 |
| 34 | [Loenbro](https://jobspipe.dev/hiring/loenbro.com) | 9 | 16 Nov 2026 |
| 35 | [CWA](https://jobspipe.dev/hiring/cwa.de) | 8 | 17 Nov 2026 |
| 36 | [NASA Jet Propulsion Laboratory](https://jobspipe.dev/hiring/jpl.nasa.gov) | 8 | 17 Nov 2026 |
| 37 | [ClearPlan LLC](https://jobspipe.dev/hiring/clearplanconsulting.com) | 7 | 18 Nov 2026 |
| 38 | [Kansas City National Security Campus](https://jobspipe.dev/hiring/kcnsc.doe.gov) | 7 | 4 Nov 2026 |
| 39 | [Navantia UK](https://jobspipe.dev/hiring/navantia.co.uk) | 7 | 17 Nov 2026 |
| 40 | [Rocketdyne](https://jobspipe.dev/hiring/rocketdyne.com) | 7 | 16 Nov 2026 |
| 41 | [Victaulic](https://jobspipe.dev/hiring/victaulic.com) | 7 | 1 Nov 2026 |
| 42 | [American Rheinmetall](https://jobspipe.dev/hiring/rheinmetall.com) | 6 | 8 Oct 2026 |
| 43 | [Bollinger Shipyards](https://jobspipe.dev/hiring/bollingershipyards.com) | 6 | 30 Oct 2026 |
| 44 | [Edgewater Technical Associates](https://jobspipe.dev/hiring/edgewatertech.net) | 6 | 28 Oct 2026 |
| 45 | [General Dynamics Land Systems](https://jobspipe.dev/hiring/gdls.com) | 6 | 18 Nov 2026 |
| 46 | [Kearfott Corporation](https://jobspipe.dev/hiring/kearfott.com) | 6 | 14 Nov 2026 |
| 47 | [Merrick & Company](https://jobspipe.dev/hiring/merrick.com) | 6 | 12 Nov 2026 |
| 48 | [Mitsubishi Power Americas, Inc.](https://jobspipe.dev/hiring/amer.power.mhi.com) | 6 | 17 Nov 2026 |
| 49 | [Quantech Services](https://jobspipe.dev/hiring/quantechserv.com) | 6 | 18 Nov 2026 |
| 50 | [Barrick Mining Corporation](https://jobspipe.dev/hiring/barrick.com) | 5 | 17 Oct 2026 |
| 51 | [Consertus](https://jobspipe.dev/hiring/consertus.com) | 5 | 16 Nov 2026 |
| 52 | [Holtec International](https://jobspipe.dev/hiring/holtecinternational.com) | 5 | 18 Nov 2026 |
| 53 | [Infleqtion](https://jobspipe.dev/hiring/infleqtion.com) | 5 | 18 Nov 2026 |
| 54 | [Redwood Materials](https://jobspipe.dev/hiring/redwoodmaterials.com) | 5 | 7 Nov 2026 |
| 55 | [Seventh Sense, LLC](https://jobspipe.dev/hiring/seventhsense.us) | 5 | 16 Nov 2026 |
| 56 | [Strategic Management Solutions, LLC (SMSI)](https://jobspipe.dev/hiring/smsi.us) | 5 | 16 Nov 2026 |
| 57 | [AACE International - United Kingdom](https://jobspipe.dev/hiring/web.aacei.org) | 4 | 18 Nov 2026 |
| 58 | [Ardurra](https://jobspipe.dev/hiring/ardurra.com) | 4 | 16 Nov 2026 |
| 59 | [Canadian Nuclear Laboratories](https://jobspipe.dev/hiring/cnl.ca) | 4 | 28 Oct 2026 |
| 60 | [City of Seattle](https://jobspipe.dev/hiring/seattle.gov) | 4 | 3 Nov 2026 |
| 61 | [Group PMX](https://jobspipe.dev/hiring/grouppmx.com) | 4 | 14 Nov 2026 |
| 62 | [Jefferson Lab](https://jobspipe.dev/hiring/jlab.org) | 4 | 25 Sep 2026 |
| 63 | [Keel](https://jobspipe.dev/hiring/keelusa.com) | 4 | 12 Nov 2026 |
| 64 | [Parry Labs](https://jobspipe.dev/hiring/parrylabs.com) | 4 | 12 Nov 2026 |
| 65 | [Semper Valens Solutions](https://jobspipe.dev/hiring/sempervalens.com) | 4 | 17 Nov 2026 |
| 66 | [StraCon Services Group, LLC.](https://jobspipe.dev/hiring/stracongroup.com) | 4 | 6 Nov 2026 |
| 67 | [THE PMO SQUAD](https://jobspipe.dev/hiring/thepmosquad.com) | 4 | 11 Nov 2026 |
| 68 | [Akina, Inc.](https://jobspipe.dev/hiring/akina-inc.com) | 3 | 4 Oct 2026 |
| 69 | [Clark Construction](https://jobspipe.dev/hiring/clarkcc.com) | 3 | 17 Nov 2026 |
| 70 | [CMTS LLC](https://jobspipe.dev/hiring/cmtsllc.com) | 3 | 30 Sep 2026 |
| 71 | [Crescent Systems, Inc.](https://jobspipe.dev/hiring/csitx.com) | 3 | 16 Nov 2026 |
| 72 | [Dynamo Technologies](https://jobspipe.dev/hiring/dynamotechnologies.com) | 3 | 23 Sep 2026 |
| 73 | [Eversource Energy](https://jobspipe.dev/hiring/jobs.eversource.com) | 3 | 11 Nov 2026 |
| 74 | [GHD](https://jobspipe.dev/hiring/ghd.com) | 3 | 3 Nov 2026 |
| 75 | [InEight](https://jobspipe.dev/hiring/ineight.com) | 3 | 11 Nov 2026 |
| 76 | [Irving Shipbuilding](https://jobspipe.dev/hiring/shipsforcanada.ca) | 3 | 9 Nov 2026 |
| 77 | [Linxon](https://jobspipe.dev/hiring/linxon.com) | 3 | 10 Nov 2026 |
| 78 | [One Federal Solution](https://jobspipe.dev/hiring/onefederalsolution.com) | 3 | 10 Oct 2026 |
| 79 | [Protecnium](https://jobspipe.dev/hiring/protecnium.com) | 3 | 8 Oct 2026 |
| 80 | [Science and Engineering Services, LLC](https://jobspipe.dev/hiring/sesllc-us.com) | 3 | 10 Nov 2026 |
| 81 | [The GBS Group](https://jobspipe.dev/hiring/thegbsgroup.us) | 3 | 29 Sep 2026 |
| 82 | [Trace3](https://jobspipe.dev/hiring/trace3.com) | 3 | 12 Nov 2026 |
| 83 | [Wasco](https://jobspipe.dev/hiring/wascoenergy.com) | 3 | 12 Nov 2026 |
| 84 | [Yulista Holding LLC](https://jobspipe.dev/hiring/yulista.com) | 3 | 6 Nov 2026 |
| 85 | [Accenture DACH](https://jobspipe.dev/hiring/accenture.de) | 2 | 25 Sep 2026 |
| 86 | [AIS](https://jobspipe.dev/hiring/groupeais.fr) | 2 | 1 Nov 2026 |
| 87 | [All Points Logistics](https://jobspipe.dev/hiring/allpointsllc.com) | 2 | 22 Oct 2026 |
| 88 | [Altrad Services APAC](https://jobspipe.dev/hiring/altrad.com.au) | 2 | 21 Oct 2026 |
| 89 | [Anglogold Ashanti](https://jobspipe.dev/hiring/anglogoldashanti.com) | 2 | 4 Nov 2026 |
| 90 | [ATGC Transport and General Contracting L.L.C](https://jobspipe.dev/hiring/atgc-uae.com) | 2 | 31 Oct 2026 |
| 91 | [AvtechTyee](https://jobspipe.dev/hiring/avtechtyee.com) | 2 | 5 Nov 2026 |
| 92 | [Bruce Power](https://jobspipe.dev/hiring/brucepower.com) | 2 | 20 Oct 2026 |
| 93 | [COOEC](https://jobspipe.dev/hiring/cnoocengineering.com) | 2 | 8 Oct 2026 |
| 94 | [Corvid Technologies](https://jobspipe.dev/hiring/corvidtec.com) | 2 | 19 Oct 2026 |
| 95 | [Fermi America](https://jobspipe.dev/hiring/fermiamerica.com) | 2 | 6 Nov 2026 |
| 96 | [Freeport-McMoRan](https://jobspipe.dev/hiring/fmjobs.com) | 2 | 30 Oct 2026 |
| 97 | [Frequentis](https://jobspipe.dev/hiring/frequentis.com) | 2 | 8 Nov 2026 |
| 98 | [Fuse Integration](https://jobspipe.dev/hiring/fuseintegration.com) | 2 | 13 Nov 2026 |
| 99 | [Galaxy](https://jobspipe.dev/hiring/galaxy.com) | 2 | 5 Oct 2026 |
| 100 | [HydroGeoLogic, Inc](https://jobspipe.dev/hiring/hgl.com) | 2 | 31 Oct 2026 |

## Earned Value Management hiring momentum

Oct 2026 was the busiest month of the period. Among confirmed Earned Value Management users, Lockheed Martin, Raytheon and Northrop Grumman posted the most Earned Value Management roles in the last 30 days.

### Companies with postings that name Earned Value Management each month, Dec 2025 to Oct 2026

| Month | Companies hiring | First seen | Postings |
|---|---|---|---|
| Dec 2025 | 4 | 3 | 5 |
| Jan 2026 | 11 | 10 | 13 |
| Feb 2026 | 13 | 10 | 14 |
| Mar 2026 | 17 | 12 | 26 |
| Apr 2026 | 26 | 17 | 32 |
| May 2026 | 41 | 27 | 51 |
| Jun 2026 | 61 | 48 | 91 |
| Jul 2026 | 344 | 303 | 776 |
| Aug 2026 | 1,184 | 946 | 3,871 |
| Sep 2026 | 1,377 | 716 | 4,112 |
| Oct 2026 | 1,526 | 649 | 4,951 |

### Most active Earned Value Management hirers in the last 30 days

| # | Company | Earned Value Management roles in 30 days |
|---|---|---|
| 1 | [Lockheed Martin](https://jobspipe.dev/hiring/lockheedmartin.com) | 303 |
| 2 | [Raytheon](https://jobspipe.dev/hiring/rtx.com) | 251 |
| 3 | [Northrop Grumman](https://jobspipe.dev/hiring/northropgrumman.com) | 247 |
| 4 | [BAE Systems, Inc.](https://jobspipe.dev/hiring/baesystems.com) | 103 |
| 5 | [Turner & Townsend](https://jobspipe.dev/hiring/turnerandtownsend.com) | 60 |
| 6 | [Honeywell Aerospace](https://jobspipe.dev/hiring/honeywellaerospace.com) | 35 |
| 7 | [QinetiQ US](https://jobspipe.dev/hiring/us.qinetiq.com) | 27 |
| 8 | [Blue Origin](https://jobspipe.dev/hiring/blueorigin.com) | 24 |
| 9 | [Sierra Nevada Corporation](https://jobspipe.dev/hiring/sncorp.com) | 23 |
| 10 | [Leonardo DRS](https://jobspipe.dev/hiring/leonardodrs.com) | 21 |

## Recently adopted

- [eAspire Technolabs Inc.](https://jobspipe.dev/hiring/easpiretech.com), first seen 19 Nov 2026
- [Delta Electronics Southeast Asia & Oceania](https://jobspipe.dev/hiring/deltathailand.com), first seen 19 Nov 2026
- [Samsung C&T India Pvt. Ltd](https://jobspipe.dev/hiring/samsungcnt.com), first seen 19 Nov 2026
- [Evoke HR Solutions Pvt. Ltd.](https://jobspipe.dev/hiring/evokehr.com), first seen 19 Nov 2026
- [Paradigm Technology](https://jobspipe.dev/hiring/pt-corp.com), first seen 19 Nov 2026
- [Technip Energies](https://jobspipe.dev/hiring/ten.com), first seen 18 Nov 2026
- [Skyline Recruitment Ltd](https://jobspipe.dev/hiring/skylinerl.com), first seen 18 Nov 2026
- [Juniper](https://jobspipe.dev/hiring/junipercares.com), first seen 18 Nov 2026
- [TMC Technologies](https://jobspipe.dev/hiring/tmctechnologies.com), first seen 17 Nov 2026
- [IFS](https://jobspipe.dev/hiring/ifs.com), first seen 17 Nov 2026
- [DSJ Global](https://jobspipe.dev/hiring/dsjglobal.com), first seen 17 Nov 2026
- [Real](https://jobspipe.dev/hiring/realstaffing.com), first seen 17 Nov 2026

## Roles that name it most

- Business Services and Administration Managers Not Elsewhere Classified
- Management and Organization Analysts
- Engineering Professionals Not Elsewhere Classified
- Construction Managers
- Information and Communications Technology Services Managers
- Civil Engineering Technicians
- Financial Analysts
- Finance Managers

## By country

- [United States](https://jobspipe.dev/technologies/earned-value-management/us)
- [Canada](https://jobspipe.dev/technologies/earned-value-management/ca)
- [United Kingdom](https://jobspipe.dev/technologies/earned-value-management/gb)
- [India](https://jobspipe.dev/technologies/earned-value-management/in)
- [Australia](https://jobspipe.dev/technologies/earned-value-management/au)
- [United Arab Emirates](https://jobspipe.dev/technologies/earned-value-management/ae)
- [Saudi Arabia](https://jobspipe.dev/technologies/earned-value-management/sa)
- [Germany](https://jobspipe.dev/technologies/earned-value-management/de)
- [France](https://jobspipe.dev/technologies/earned-value-management/fr)
- [Spain](https://jobspipe.dev/technologies/earned-value-management/es)

## FAQ

### How many companies use Earned Value Management?

2,116 companies have job postings that show they use Earned Value Management, as of 19 Nov 2026. 270 are confirmed and 1,846 are likely.

### Which companies use Earned Value Management?

Northrop Grumman, Raytheon, Lockheed Martin, BAE Systems, Inc., Turner & Townsend are among the confirmed Earned Value Management users with the most postings naming it. The full list on this page names 100 companies.

### Where are the companies that use Earned Value Management hiring?

Most postings that name Earned Value Management are in United States, Canada, United Kingdom. Country is where the job is, not where the company is headquartered.

### Which roles ask for Earned Value Management?

Business Services and Administration Managers Not Elsewhere Classified, Management and Organization Analysts, Engineering Professionals Not Elsewhere Classified are the occupations whose postings name Earned Value Management most often.

### How does JobsPipe know a company uses Earned Value Management?

From the company's own job postings. Each posting is read for the technologies it names, and every company and technology pair is graded: confirmed when two independent checks agree on Earned Value Management in at least one posting, likely when it is a stated requirement or appears in two separate postings. A single passing mention is not counted here. It is evidence of a team working with Earned Value Management, not a purchase record.

## Reproduce

```bash
curl -X POST https://api.jobspipe.dev/v1/companies/search -H "Authorization: Bearer $JOBSPIPE_API_KEY" -H "Content-Type: application/json" -d '{"company_technology_slug_or":["earned-value-management"],"tier_min":"confirmed","limit":25}'
```


**Next step:** Open the companies using Earned Value Management in JobsPipe. [Open the list](https://jobspipe.dev/signup?ref=technology-md&goal=tech&next=%2Fdashboard%2Fask%3Fq%3DWhich%2520companies%2520use%2520Earned%2520Value%2520Management%252C%2520and%2520which%2520of%2520them%2520are%2520hiring%2520now%253F)

---
Try it with no key: `curl -d '{"limit":3}' https://api.jobspipe.dev/v1/sandbox/jobs/search`. AI agents: the full machine-readable index of this site is https://jobspipe.dev/llms.txt?src=md-twin - API quickstart, MCP server, pricing. Free key (1,000 jobs to start): https://jobspipe.dev/signup